PROBLEMS AND PROSPECTS FOR THE “FOURTH CORRIDOR”: THE POSITIONS AND ROLE OF TURKEY IN GAS TRANSIT TO EUROPEPublished on EGF: 01.06.2009 by Gareth M Winrow PROBLEMS AND PROSPECTS FOR THE FOURTH CORRIDOR THE POSITIONS AND ROLE OF TURKEY IN GAS TRANSIT TO EUROPE Oxford Institute for Energy Studies Gareth M Winrow June 2009 NG 30 i The contents of this paper are the author s sole responsibility They do not necessarily represent the views of the Oxford Institute for Energy Studies or any of its members Copyright 2009 Oxford Institute for Energy Studies Registered Charity No 286084 This publication may be reproduced in part for educational or nonprofit purposes without special permission from the copyright holder provided acknowledgment of the source is made No use of this publication may be made for resale or for any other commercial purpose whatsoever without prior permission in writing from the Oxford Institute for Energy Studies ISBN 9781901795899 ii Preface The subject of Caspian and Middle East gas pipelines to Europe has become increasingly important and emotive in the late 2000s with many projects and aspirations being advanced to create a 4th corridor aimed at significant reducing dependence on primarily Russian gas The role of Turkey will be critical for all of these projects While the details of pipeline projects are well known the role and aspirations of Turkey as an energy transit country have received less attention Some have portrayed Turkey as a country critical to European energy security and a potential hub for Caspian and Middle East oil and gas supplies But some Turkish statements and commercial positions in relation to pipeline projects have raised questions about the conditions which the country may intend to attach to this role some of which could be seen as obstacles to natural gas transit Because of the partisan nature of much of the current debate it was important to find an author capable of making an expert but unbiased assessment of the Turkish position Gareth Winrow has long experience in Turkey and was the ideal choice to interview Turkish stakeholders in relation to the many different aspects of the country s energy situation and the fourth corridor I am very grateful to Gareth for taking on this project and believe that his paper adds significantly to understanding the complexity of the problems related to these issues Jonathan Stern June 2009 iii CONTENTS ABBREVIATIONS v ACKNOWLEDGEMENT vii 1 Introduction 1 2 The Regional Political Context 4 2 1 Turkey the Caucasus and Russia 4 2 2 Turkey Iraq Turkey Iran Relations 6 3 Turkey and EU Accession 7 4 Security of Pipeline Infrastructure in Turkey 9 5 Key Players in Turkey s Energy Sector 11 6 Turkey s Gas Needs 13 7 Turkey and Gas Supply Security 18 8 Turkey and Access to Low Cost Gas 21 9 Turkey and Transit Opportunities 23 10 Turkey and Trade Opportunities 26 11 Conclusion 27 APPENDIX 1 Proposed Pipelines for the Fourth Natural Gas Corridor and South Stream 29 FIGURES Figure 1 Priority Pyramid for Turkish Gas Sector 18 TABLES Table 1 The Fourth Natural Gas Corridor 2 Table 2 Turkey Natural Gas Demand and Contracted Volumes mcm 15 Table 3 Turkey Natural Gas and LNG Imports mcm 15 Table 4 Natural Gas Demand by Sector Turkey 2006 and 2030 17 iv ABBREVIATIONS bcm Billion cubic metres BOTAS Petroleum Pipeline Corporation BTC Baku Tbilisi Ceyhan CAPEX Capital expenditure CDC Caspian Development Corporation DEPA Public Gas Corporation DTP Democratic Society Party ECT Energy Charter Treaty EEZ Exclusive Economic Zone EMRA Energy Market Regulatory Authority EU European Union GATT General Agreement on Tariffs and Trade GDP Gross domestic product IGA Intergovernmental agreement IMF International Monetary Fund ITG Interconnector Turkey Greece ITGI Interconnector Turkey Greece Italy LNG Liquefied natural gas mcm Million cubic metres MENR Ministry of Energy and Natural Resources MFA Ministry of Foreign Affairs mtoe Million tons of oil equivalent MW Megawatts NATO North Atlantic Treaty Organisation v NG Natural Gas NIGEC National Iranian Gas Export Company OME Observatoire Mediterraneen de l Energie OPEX Operational expenditure PKK Kurdistan Workers Party SCP South Caucasus Pipeline SOCAR State Oil Company of Azerbaijan TAP Trans Adriatic Pipeline tcm Trillion cubic metres TEN E Trans European energy networks TPAO Turkish Petroleum Corporation US United States WTO World Trade Organisation 000 cm Thousand cubic metres vi ACKNOWLEDGEMENT I would like to first thank Jonathan Stern for inviting me to prepare this monograph My thanks also go to the various officials energy company representatives commentators and others in Istanbul and Ankara who were interviewed for this project A number of them have wished to remain anonymous Finally my special thanks go to Nazan for giving me the encouragement and support to work on this and other projects vii 1 Introduction The Russian Ukrainian gas crisis of January 2009 occurring three years after a similar dispute between Moscow and Kyiv had disrupted Russian natural gas supplies to Europe led many European commentators to question the continued reliability of Russia as a supplier of natural gas The role of Ukraine as an energy transit state was also put under the spotlight The January 2009 crisis followed the conflict between Russia and Georgia in August 2008 This brief war had compelled governments in member states of the European Union EU to reconsider the wisdom of being dependent for over 40 percent of their gas imports from an increasingly emboldened and aggressive Russia Attention has focussed more on developing projects which would supply natural gas to Europe from sources other than Russia along routes which would bypass Russian territory The so called fourth or southern gas corridor connecting the Caspian and Gulf regions and the Middle East to Europe the other three corridors running to EU member states from Russia Norway and north Africa has been identified by the European Commission as Natural Gas NG Route Number 3 in the framework of the Trans European energy networks TEN E Most of the gas pipelines which may form part of the fourth corridor would cross Turkey If all these pipelines were constructed and operated simultaneously at full capacity they could deliver about 95 billion cubic metres annually bcm y to Europe see Table 1 Much attention has been given to the prospects for realising the Nabucco project which would entail the construction of a dedicated pipeline through Turkish territory However the Interconnector Turkey Greece ITG is already in place and is carrying small volumes of gas to Greece via Turkey from the Azeri Shah Deniz gas field in the Caspian Sea This gas reaches Turkey along the 20 bcm y capacity South Caucasus Pipeline SCP also known as the Baku Tbilisi Erzurum gas pipeline Plans are well developed to connect the ITG to Italy by forming the Interconnector Turkey Greece Italy ITGI The Trans Adriatic Pipeline project TAP may also be developed given StatoilHydro s interest In February 2008 it was announced that StatoilHydro had formed a joint venture with the Swiss based EGL to work on the TAP StatoilHydro has a 25 5 percent stake in the Shah Deniz consortium and in the SCP In order to be realised both the IGTI and the TAP would probably depend on incremental expansions to the Turkish gas pipeline network The White Stream project is planned to connect Georgia to central Europe bypassing Turkey but is unlikely to be constructed in the foreseeable future given the current problems in Ukraine With no information at the time of writing with regard to investors sources of gas or intended markets the White Stream project is much less advanced than Nabucco the ITGI and the TAP Moscow has been vehemently lobbying for the realisation of the South Stream project which would bypass Turkey and would connect the Russian gas network with central and southern Europe 1 1 For further basic details on these proposed gas pipelines see Appendix 1 1 Table 1 The Fourth Natural Gas Corridor Name Route Initial capacity Final capacity Nabucco TurkeyBulgaria 8bcm y 31 bcm y by RomaniaHungary in 2014 2019 Austria ITGI TurkeyGreece 3 5 bcm y 12 bcm y by Italy in 2007 2013 TAP Turkey 10 bcm y 20 bcm y by GreeceAlbaniaItaly in 2012 White Stream GeorgiaRomania 8 bcm y 32 bcm y by Central Europe In 2015 or GeorgiaUkraine Central Europe or GeorgiaUkraine RomaniaCentral Europe SOURCE Information collected by the author from various sources The TurkishGreek section is already in operation The pipeline begins at Thessalonika but gas will be initially transported to Greece via Turkey Addressing an international energy conference in Sofia in April 2009 Turkish President Abdullah Gul declared Becoming the fourth artery of Europe in terms of natural gas is among our main objectives 2 There has been much talk in recent years of Turkey becoming a key energy hub although it is not clear what this would exactly entail Clearly though officials in Ankara are eager to stress Turkey s strategic importance which they believe could boost the prospects for Turkey s eventual admission to the EU Bearing in mind the concerns of the European Commission with regard to the need to diversify the sources and import routes of natural gas policy makers in Ankara are keen to emphasise how Turkey could become a significant energy transit state It will be seen in this monograph that it is not possible to separate natural gas issues from sensitive political and geopolitical matters In particular the problems relating to Turkey s EU accession negotiations have had a direct impact on discussions between Brussels and Ankara with regard to finalising the intergovernmental agreement IGA for the Nabucco project Officials in both Europe and Turkey have encountered difficulties in effectively 2 Speech by Turkish President Abdullah Gul at the Summit Conference titled Natural Gas for Europe Security and Partnership Sofia 25 April 2009 http www energysummit2009 bg en action news id 53 2 communicating with one another Misunderstandings and misperceptions confusing statements and conflicting messages have compounded these problems When conducting interviews for this monograph the author was struck by the sense of frustration felt by both Turkish and European bureaucrats and representatives of the private sector In April and May 2009 interviews were held in Istanbul and Ankara with government officials members of the Petroleum Pipeline Corporation BOTAS representatives of energy companies academics journalists and other informed observers A number of those interviewed wished to remain anonymous When completing this monograph several key developments were unfolding which could have significant repercussions for the Nabucco project specifically and for the fourth corridor more generally Immediately following the EU Southern Corridor Summit held in Prague on 8 May 2009 it was reported that an IGA on Nabucco would be signed with the Turkish authorities in Ankara on 25 June 3 This account was instantly refuted by the Turkish Energy Minister Taner Yildiz who denied that a date for signing had been fixed and who noted that certain issues remained to be resolved 4 This monograph is organised as follows The regional political context is first examined A discussion of the problems in the Turkey EU accession process is then presented There is also a brief overview of possible and actual security problems concerning the protection of pipeline infrastructure in Turkey This is followed by an analysis of the key players in the Turkish energy sector It is questioned to what extent these various actors have been able to coordinate their positions with regard to planning for the development of a fourth natural gas corridor It is also important to examine the natural gas needs of Turkey itself as Turkish officials consistently emphasise that their immediate priority is to satisfy Turkey s rising energy demand The monograph then focuses more closely on the problems and prospects of Turkey becoming a significant part of a fourth corridor bearing in mind that officials in Ankara are eager to exploit transit and trade opportunities 3 Ian Traynor Gas deal between Turkey and the European Union breaks Russian stranglehold The Guardian Brussels 11 May 2009 http www guardian co uk business 2009 may 11 euturkeynabuccogaspipeline 4 AB Turkiye Nabucco da yuzde 15 ten vazgecti diyor Ankara kabul etmiyor EU says Turkey has given up on 15 from Nabucco Ankara does not accept this Radikal 13 May 2009 p 7 3 2 The Regional Political Context 2 1 Turkey the Caucasus and Russia In the immediate aftermath of the Russian invasion of Georgia on 8 August 2008 doubts were raised about the security of the gas pipeline network in the southern Caucasus The conflict had resulted in the brief closure of the SCP Recep Tayyip Erdogan the Turkish prime minister scrambled to arrange a visit to Moscow Seeking to maintain good relations with both the North Atlantic Treaty Organisation NATO and with Russia Turkey was dependent on Russia for approximately two thirds of its natural gas imports Erdogan proposed establishing a Caucasus Stability and Cooperation Platform This initiative which would encompass Turkey Russia Armenia Azerbaijan and Georgia was aimed at restabilising the southern Caucasus In an interview with Newsweek President Gul noted that Turkey was seeking to create conditions in the Caucasus conducive for regional economic cooperation and for the safe transportation of hydrocarbons westward to Europe 5 It is important to note that relations between Ankara and Moscow have dramatically improved since the end of the Cold War The two have become major trade partners and have established a regular political dialogue In spite of this rapprochement Turkish officials were concerned that the Russian invasion of Georgia could destabilise the Caucasus Aware of Turkey s energy dependence on Russia Erdogan could not afford to jeopardise relations with Moscow The proposed Platform was thus an endeavour to maintain close ties with the Kremlin and also prevent a further escalation of conflict in the region Continued tensions between Moscow and Tbilisi and the absence of diplomatic relations between Ankara and Yerevan led to little progress being made toward the formation of the Caucasus Stability and Cooperation Platform by May 2009 Yerevan s insistence that the events of 1915 constituted genocide by the Ottoman authorities against their Armenian subjects and the failure of Armenian forces to withdraw from occupied Azeri territories in and around the disputed territory of Nagorno Karabakh have prevented Turkey from establishing diplomatic ties with Armenia However expectations have been raised about the possible reopening of the land border between Turkey and Armenia in the wake of President Gul s visit to Yerevan in September 2008 to watch a football match between Turkey and Armenia In April 2009 it was announced that Turkish and Armenian officials had agreed to a road map which could lead to the eventual normalisation of relations The possibility of Turkey normalising relations with Armenia before a settlement of the Nagorno Karabakh dispute on terms satisfactory to Azerbaijan alarmed Baku There were reports in the Turkish press probably exaggerated that Azeri President Ilham Aliyev had threatened to retaliate by suspending gas deliveries to Turkey Azerbaijan s traditional close 5 Rana Foroohar The last word pulled from two directions Newsweek 13 October 2008 http www newsweek com id 162306 4 ally and fellow Turkic state 6 Nevertheless in a more coded warning on 8 April 2009 Rovnag Abdullayev the President of the State Oil Company of Azerbaijan SOCAR stated on television that he did not believe that the Turkish Armenian border would be opened and therefore I do not expect stop of gas supplies from the Shah Deniz field to Turkey 7 Certainly President Aliyev caused a stir by boycotting the Summit meeting of the UN sponsored Alliance of Civilisations Initiative which assembled in Istanbul in April 2009 There has been speculation that the problems in relations between Ankara and Baku could result in Azerbaijan accepting Russia s offer to purchase all the gas that will be produced in the second phase of the Shah Deniz project Visiting Baku in June 2008 Alexei Miller the head of Gazprom had declared that his company was prepared to procure the gas at market prices ie the European netback price 8 This would have been considerably more than the price Turkey was then paying to receive gas from the first phase of Shah Deniz During a state visit to Moscow in April 2009 President Aliyev noted that as far as Azerbaijan was concerned there were no restrictions on possible gas cooperation with Russia 9 It has been suggested that in return for Azeri gas deliveries to Russia Moscow would compel Yerevan to come to an agreement on Nagorno Karabakh which would be favourable to Baku 10 European and Turkish concerns with regard to the future exports from the second phase of development of the Shah Deniz field may have been eased a little by President Aliyev s signature to the Declaration at the Prague Summit on the Southern Corridor in May 2009 This appeared to indicate that Azeri gas exports could continue to be transported westwards to markets in Europe Ankara s hopes of securing an agreement which could have resulted in Turkmen gas volumes being transported to Europe via Azerbaijan and Turkey in the foreseeable future were dashed after President Gul met his Azeri and Turkmen counterparts behind closed doors in Ashgabat in late November 2008 It was merely announced that the three parties would develop 6 Barcin Yinanc Ermenistan la sinir kapisini acarsaniz gazinizi keserim Your gas will be stopped if you open the border gate with Armenia Referans 2 April 2009 http www referansgazetesi com haber aspx YSR_KOD 141 HBR_KOD 120139 7 Shahin Abbasov Azerbaijan Is Baku ready to cause geopolitical problems over TurkishArmenian thaw Eurasia Insight 14 April 2009 http www eurasianet org departments insightb articles eav041409 shtml 8 Gazprom delegation pays visit to Azerbaijan OAO Gazprom Information Division 2 June 2008 http www gazprom com eng news 2008 06 28912 shtml 9 President Ilham Aliyev and President of Russia Dmitry Medvedev gave a joint conference in Moscow www president az 17 April 2009 http www president az articles php stem_id 20090418105940136 sec_id 13 10 Shahin Abbasov Azerbaijan Is Baku offering a natural gas carrot to Moscow for help with Karabakh Eurasia Insight 20 April 2009 http www eurasianet org departments insightb articles eav042009a shtml 5 cooperation in the energy field and would hold regular consultations 11 Prior to the meeting there had been speculation that Gul could mediate between the Azeris and Turkmens over certain disputed gas fields in the Caspian Sea and win the approval of both sides to construct a gas pipeline to connect the Turkmen Livanov Barinova Lam structure with Azerbaijan s Azeri Chirag Guneshli fields This connection could have been accepted by the authorities in Moscow and Tehran who have objected to the laying of a gas pipeline across the length of the Caspian Sea Russia and Iran have insisted that the five littoral states should first reach agreement on the status and division of the Caspian Sea before trans Caspian pipelines could possibly be constructed However Azerbaijan Kazakhstan and Russia have effectively agreed to the division of the seabed in the northern Caspian using the median line approach But the Iranians have continued to insist that each state should be allocated a 20 percent share of both the surface area and the seabed regardless of the length of their coastlines The position of the Turkmens has fluctuated and remains unclear The Prague Declaration following the Southern Corridor Summit in May 2009 noted optimistically that it had been agreed to give political support and if possible technical and financial assistance to trans Caspian energy transportation projects 12 2 2 Turkey Iraq Turkey Iran Relations Beyond the wider Black Sea region at the time of writing it remained unclear whether the security situation in Iraq would improve sufficiently to enable Iraqi gas exports at some future date to be delivered to Europe via Turkey And it was uncertain whether the Obama administration s willingness to open diplomatic channels with Iran could result in the United States US lifting its opposition to the possibility of substantial volumes of Iranian gas reaching Europe through Turkey According to a memorandum of understanding concluded in May 2007 Turkey had agreed to invest 3 5 billion in three blocks in the Iranian South Pars gas field and there were tentative plans to transport 30 bcm y of Iranian and Turkmen gas to Europe across Turkish territory 13 The lifting of US sanctions against Iran would also boost the prospects for the TAP project In March 2008 EGL had finalised a gas sales and 11 Turkmen Azerbaijani and Turkish Presidents agree to maintain regular contacts www Turkmenistan Ru 30 November 2008 http www turkmenistan ru page_id 3 lang_id en elem_id 14053 type event sort date_desc 12 The Declaration Prague Summit Southern Corridor May 8 2009 http www eu2009 cz en newsand documents pressreleases declarationpraguesummitsoutherncorridormay8200921533 13 Vladimir Socor Turkey offers route to Europe for Iranian and Turkmen gas Eurasia Daily Monitor Vol 4 no 140 19 July 2007 http www jamestown org single no_cache 1 tx_ttnews 5Btt_news 5D 32877 6 purchase agreement with the National Iranian Gas Export Company NIGEC for the delivery of up to 5 5 bcm y of Iranian gas to Europe using the TAP 14 3 Turkey and EU Accession An understanding of the problems with regard to Turkey s EU membership talks which started in October 2005 is crucial to the appreciation of for example the difficulties concerning the negotiations for the IGA on Nabucco between the European Commission and Turkey Of the 35 chapters of the EU acquis that need to be opened and closed before the accession process may be completed as of May 2009 only ten chapters had been opened and only one chapter provisionally closed the non controversial science and research chapter Eight chapters could not be opened because of Turkey s refusal to open its air and sea ports to Cypriot planes and shipping The opening of a further five chapters was blocked by France with French President Nikolas Sarkozy openly declaring that he was opposed to Turkey joining the EU The Austrian French and German governments prefer to offer Turkey a form of privileged partnership instead of full membership of the EU The Cypriot government has been blocking the opening of the energy chapter which had been successfully screened and was ready to be opened This was because the Turkish navy was preventing the Greek Cypriots from carrying out oil and gas exploration in what they considered to be their exclusive economic zone EEZ in the eastern Mediterranean According to the Turkish government this exploration could only be undertaken after a political agreement had been reached on unifying the island of Cyprus so that both Greek and Turkish Cypriots could benefit from the exploration Clearly exasperated Olli Rehn the EU Enlargement Commissioner and usually a firm supporter of Turkey s admission to the EU declared in Brussels in March 2009 that Ankara should refrain from gunboat diplomacy if they wished for the energy chapter to be opened Turkey s then Energy Minister Hilmi Guler was present at the meeting in which Rehn made these remarks 15 Much attention has been given to the comments made by Prime Minister Erdogan at the European Policy Centre in Brussels in January 2009 when he noted that if the energy chapter remained blocked Turkey could abandon its support for Nabucco Later the same day at a meeting with Jose Manuel Barroso the President of the European Commission Erdogan had 14 EGL seals final gas purchase agreement with NIGEC EGL Media Press Release Dietikon Tehran 17 March 2008 http www egl ch int ch en media news archiv 2008 march nigec html 15 Amanda Akcakoca Turkey s Nabucco support unconditional What about the EU Today s Zaman 11 March 2009 http www todayszaman com tzweb yazarDetay do haberno 169225 7 backtracked and asserted that Turkey did not want to use energy as a political weapon 16 Nevertheless the prime minister s earlier remarks had provoked the German Economy Minister Michael Glos to proclaim that Turkey was attempting to use Nabucco as leverage in order to join the EU 17 Certainly Erdogan has a reputation of speaking openly on issues of the day and his critics have referred to him as a loose cannon Selim Kuneralp the deputy undersecretary in charge of economic affairs at Turkey s Ministry of Foreign Affairs MFA in a later interview with the Austrian daily Die Presse stated that although there was no formal link between Turkey s EU accession and Nabucco progress on the project could be accelerated if the energy chapter was opened This was because the chapter s opening would lead to a speeding up in Turkey of the adoption of EU law on energy policy 18 It appears that without the opening of the energy chapter Turkey will not sign the Energy Community Treaty This treaty aims to establish a single regulatory framework for uniform energy trading across south eastern Europe and the EU States in south eastern Europe would become part of the EU s internal energy market and would commit themselves to implement the energy acquis At present Turkey remains an observer to the Energy Community Treaty a treaty it had helped to draw up and it seems likely that it will not agree to the energy acquis as a whole unless the energy chapter is actually opened and progress therefore made in its accession talks 19 Apparently to the annoyance of EU bureaucrats and representatives of energy companies officials in Ankara have questioned why they should accept the applicability of EU laws on Turkish territory when Turkey is not a member of the EU and the opening of the energy chapter remains blocked due to a political veto Nevertheless among some observers the perception persists that Turkey has been dragging out the negotiations on the IGA for Nabucco in order to gain leverage in talks on EU accession and on other issues such as Cyprus 20 Significantly immediately before a visit to 16 Turkey plays energy card in stalled EU accession talks EurActiv com 20 January 2009 http www euractiv com en enlargement turkeyplaysenergycardstalledeuaccession talks article 178623 17 Turkey blackmailing EU over gas pipeline German minister says Deutsche Welle 20 January 2009 http www dwworld de dw article 0 3962409 00 html 18 Kuneralp Niemand kummert sich wirklich um Nabucco Kuneralp Nobody is really caring about Nabucco Die Presse 5 February 2009 http diepresse com home wirtschaft eastconomist 450163 index do from simarchiv 19 Katinka Barysch Turkey s role in European energy security Centre for European Reform Essays December 2007 pp 67 http www cer org uk pdf essay_turkey_energy_12dec07 pdf 20 Vladimir Socor Nabucco project faces Turkish hurdles at critical turn Eurasia Daily Monitor Vol 6 no 80 27 April 2009 http www jamestown org programs edm single tx_ttnews 5Btt_news 5D 34908 tx_ttnews 5BbackPi d 5D 407 no_cache 1 8 Ankara Jozias Van Aartsen the EU s coordinator for natural gas projects in the southern fourth corridor had gone on the record as saying that if Turkey wanted a relationship with the EU then working together on Nabucco would be one way of making clear that Turkey was in earnest 21 On the other hand many Turkish officials interviewed by the author have argued that it is rather divisions between EU member states and EU institutions and the absence of a common European energy policy which have caused problems in negotiations over the IGA for Nabucco The then Energy Minister Guler complained how European officials would keep returning to issues that had previously been agreed upon and would shift and revise their earlier positions 22 Several Turkish commentators interviewed by the author were discontented that Van Aartsen had not spent enough time in Turkey to familiarise himself with the policies of Ankara 4 Security of Pipeline Infrastructure in Turkey Serious threats to the security of the pipeline network in Turkey would obviously jeopardise the prospects of Turkey becoming a key energy transit state The conflict between Russia and Georgia in August 2008 and the temporary closure of the SCP had led commentators to reassess how secure the pipeline network was in the southern Caucasus even though Russia insisted that it had not intentionally targeted energy infrastructure There have also been concerns that the re igniting of the frozen dispute between Armenia and Azerbaijan over Nagorno Karabakh could endanger the SCP and the Baku Tbilisi Ceyhan BTC crude oil pipeline given their proximity to the disputed territory Regular attacks since 2003 on the Kirkuk Ceyhan oil pipeline network in northern Iraq by insurgents opposed to the authorities in Baghdad have also led Ankara to give prominence to issues involving the protection of pipeline infrastructure In the case of the Turkish pipeline grid there is a particular concern over the threat posed by the Kurdistan Workers Party PKK a rebel group recognised as a terrorist organisation by the authorities in the EU and the US The PKK has periodically attacked pipelines in south eastern Turkey in largely Kurdish populated territory where it has been traditionally active These attacks have included two strikes against the Kirkuk Ceyhan pipeline in November 2008 and a further two targeting the Iran Turkey gas pipeline in May 2008 Much publicity was given to the fire on the BTC oil pipeline on 5 August 2008 An explosion had occurred on the above ground pipeline valve number 30 near Refahiye in Erzincan province in north eastern Turkey This led to the closure of the BTC oil pipeline for 16 days On 7 August the PKK claimed responsibility for 21 Ed Crooks Turkey pressed for support on gas scheme Financial Times 10 February 2008 22 Elitsa Vucheva Turkey wants clear European position on Nabucco EUObserver 5 March 2009 http euobserver com 9 27716 9 the explosion but this was swiftly denied by the authorities in Ankara who alleged that the fire had been caused by a technical failure 23 If the PKK had indeed struck the BTC oil pipeline this would be a major propaganda success for them given the high profile nature of the pipeline and given that the attack occurred in territory well beyond the PKK s usual area of operations The PKK had earlier threatened to sabotage the BTC oil pipeline There has also been speculation that the attack may have been linked with the conflict between Russia and Georgia which commenced three days later 24 But such direct coordination between the PKK and Moscow seems difficult to envisage One interesting argument which could have more credence is that the PKK attacked pipelines in Turkey to demonstrate its destructive capabilities in order to secure covert or open support from an outside state 25 The attack on 5 August could therefore have been an attempt by the PKK to attract Russian backing Although Turkish officials have in public strenuously and repeatedly denied that the PKK had hit the BTC oil pipeline it does appear that the PKK had targeted the pipeline 26 This then begs the question whether in future Nabucco or other gas pipelines in Turkey may also be attacked by the PKK One may contend that the threat posed by the PKK is diminishing for various reasons Better intelligence sharing with the US has resulted in more effective Turkish air strikes against PKK forces holed up in the Kandil Mountain in northern Iraq The establishment of a trilateral security mechanism between Ankara Washington and Baghdad and the greatly improved relations between Ankara and the Kurdish authorities in northern Iraq have inhibited the movements of the PKK When President Gul visited Baghdad in March 2009 his Iraq counterpart Jalal Talabani himself a northern Iraqi Kurd announced that the PKK 23 Gareth Jenkins Explosion raises questions about the security of the BTC pipeline Eurasia Daily Monitor Vol 5 no 152 8 August 2008 http www jamestown org programs edm single tx_ttnews 5Btt_news 5D 33875 tx_ttnews 5BbackPi d 5D 166 no_cache 1 24 Nihat Ali Ozcan Energy security and the PKK threat to the BakuTbilisiCeyhan pipeline Terrorism Monitor The Jamestown Foundation Vol 16 no 18 22 September 2008 http www jamestown org programs gta single tx_ttnews 5D 5170 tx_ttnews 5BbackPid 5D 167 no _cache 1 25 Emrullah Uslu Is the PKK sabotaging energy infrastructure in a search for a Superpower partner Terrorism Focus The Jamestown Foundation Vol 5 no 42 12 December 2008 http www jamestown org programs gta single tx_ttnews 5D 34263 tx_ttnews 5BbackPid 5D 246 n o_cache 1 26 The author has come to this conclusion after interviews with various commentators both inside and outside of Turkey 10 should lay down their arms or leave Iraq 27 There are indications that the Turkish military may back the government in Ankara in giving effectively an amnesty for PKK militants not involved in murder 28 This could encourage the fragmenting of the PKK However in spite of increased military and political pressure on the PKK it appears that the Kurdish rebels will neither lay down their weapons nor disband in the foreseeable future A conference of Kurdish groups planned to convene in Arbil in northern Iraq to discuss the future of the Kurds in Turkey and other neighbouring states has had to be postponed several times in part because of disagreements over how to handle the PKK An amnesty for the PKK would be highly unpopular among certain sectors of Turkish society given the high numbers of troops and civilians killed in the campaign waged against the PKK over three decades The possible enforced closure of the Democratic Society Party DTP in Turkey a party in effect representing the Kurds with 21 deputies in the Turkish parliament could further exacerbate tensions The DTP may be closed by a ruling of the Constitutional Court on the grounds that it has supported the PKK and abetted separatism in Turkey In these circumstances it appears unlikely that the PKK is about to collapse completely Moreover if the PKK perceives itself to be under grave threat it may resort to spectacular operations such as attacks on energy infrastructure in Turkey in order to demonstrate that it remains a force to be reckoned with 5 Key Players in Turkey s Energy Sector A number of players are involved in decision making in Turkey with regard to energy issues For example the Nabucco Working Group established to coordinate policy for this particular project consists of representatives from more than twenty Turkish state institutions including the Ministry of Energy and Natural Resources MENR BOTAS the MFA the Energy Market Regulatory Authority EMRA the Interior Ministry the Treasury and the Turkish Armed Forces Modelled on the earlier BTC Working Group and including several of the same personnel from that group the Nabucco Working Group reports to the MENR 29 There have also been inputs from personal advisers of the prime minister and president Evidently before being appointed to the post of Energy Minister by Prime Minister Erdogan on 1 May 2009 Taner Yildiz had been influential in energy policy making as an adviser to 27 Anthony Shadid and K I Ibrahim Turkish President visits Iraq as bombings kill 34 Washington Post Foreign Service 24 March 2009 http washingtonpost com wp dyn content article 2009 03 23 AR2009032300392 html 28 Lale Sariibrahimoglu General Basbug s remarks underline serious secularism and religion divide Today s Zaman 15 April 2009 http www todayszaman com tzweb detaylar do load detay link 172487 29 Interview with Osman Z Goksel Advisor to the Minister for Energy and Natural Resources Ankara 15 April 2009 11 Erdogan and a close associate of President Gul Yildiz had previously worked in the electricity generation sector in Kayseri Gul s home province Given the number of actors involved in decision making on energy issues in Turkey one may question to what extent policies are actually closely coordinated Each organisation has its own particular mindset bureaucratic routines and cultures and sets of interests For instance the Turkish Armed Forces will clearly be focused on security threats and wider geopolitical concerns The MFA will presumably continually bear in mind the impact of energy issues on Turkey s EU accession prospects while BOTAS and the MENR are more likely to focus on technical problems with regard to specific energy projects It has been argued that there are still shortcomings in the coordination of energy policy in Turkey particularly between the MFA and the MENR 30 Perhaps aware of such criticisms the new Energy Minister Yildiz in one of his first public statements affirmed that energy could be a catalyst to improve relations between Turkey Armenia and Azerbaijan 31 In practice it appears that since the start of 2009 the MFA has played more of a leading role in conducting negotiations with the European Commission over the IGA for Nabucco The future of BOTAS an influential player in Turkish policy making has come under question According to the Natural Gas Market Law of 2001 in order to create a free market for gas in Turkey to facilitate Turkey s admission to the EU the role of BOTAS as a gas importer would have to be significantly curtailed BOTAS was obliged to transfer 80 percent of its gas import contracts to the private sector by the end of 2009 The state body would then be divided into legally unbundled companies with the title BOTAS remaining with the import company 32 However in practice only 4 bcm had been transferred to the private sector in open tenders by spring 2009 which was a little more than 10 percent of Turkey s gas imports The head of BOTAS Saltuk Duzyol has strongly argued that the position of BOTAS as the major gas importer in Turkey should be maintained 33 Officials at BOTAS have been lobbying for other revisions to the Natural Gas Market Law so that BOTAS may conclude new import contracts to help guarantee future energy supplies According to the law in its current form new contracts may not be agreed with states from which Turkey already 30 Interview with Necdet Pamir Ankara 13 April 2009 Pamir has held a number of key positions in the Turkish Petroleum Corporation TPAO and is a Board Member of the World Energy Council Turkish National Committee 31 TurkeyArmenia thaw not to harm energy projects with Azerbaijan min Hurriyet Daily News 6 May 2009 http www hurriyet com tr english finance 11583748asp gid 244 32 For more details see F Yesim Akcollu Major Challenges to the Liberalization of the Turkish Natural Gas Market Oxford Oxford Institute for Energy Studies NG 16 November 2006 33 David O Byrne TurkeyEC at loggerheads over Nabucco Platts International Gas Report issue 620 30 March 2009 p 5 12 imports gas until these contracts expire This would prevent Turkey from concluding a new import contract with Azerbaijan for gas to be produced in the second phase of Shah Deniz It has been argued that BOTAS should remain a leading actor in the gas market and act as a locomotive behind which private companies could follow 34 Duzyol has stressed that it was imperative that BOTAS should remain strong in order to negotiate effectively on issues of energy transit with other powerful energy companies 35 Indeed the proposal that BOTAS should merge with the Turkish Petroleum Corporation TPAO to create a new national energy champion able to compete with its European rivals has attracted increasing support This new company could be involved in exploration production transportation refining trading storage and activities concerned with liquefied natural gas LNG for example 36 It remains to be seen whether such a powerful vertically integrated company will be formed in the foreseeable future and what impact this company could then have on negotiations involving natural gas projects and the development of a fourth gas corridor However it does appear likely that the Natural Gas Market Law of 2001 will shortly be amended and as a consequence BOTAS will remain an influential player in energy policy making in Turkey There is an assumption that BOTAS will officially be recognised as the Nabucco Turkey Company responsible for overseeing the construction of the Nabucco pipeline on Turkish territory And there are indications that energy policy is becoming better coordinated in Turkey after the appointment of a new energy minister together with the increased role of the MFA in negotiations on Nabucco Certainly there is a real need for Turkey to be seen as acting in a united and coherent manner on issues relating to natural gas transit bearing in mind the problems of misperception and breakdowns in communication with EU bureaucrats and representatives of European governments and energy companies 6 Turkey s Gas Needs Turkey is a significant producer neither of natural gas nor crude oil Officials in Ankara insist that with continued economic growth Turkey will need to import substantially more gas for the foreseeable future Gas volumes from the Caspian Sea and Gulf regions and the Middle East as well as transiting Turkish territory to Europe through a fourth corridor are also 34 Interview with Emre Engur Head of Strategy Development and International Projects Department BOTAS Ankara 14 April 2009 35 H Saltuk Duzyol Nabucco Projesi ve Turkiye The Nabucco Project and Turkey Presentation made to the Middle East Technical University Alumni Association Ankara 28 March 2009 http www odtumd org tr etkinlik 2009 03 NABUCCO_projesi NABUCCO_Sunumu_ODTU_S_Duzyol_28_03 _09 pdf 36 Oguz Turkyilmaz Proposals for a new natural gas strategy for Turkey Presentation made to the Eighth Turkish International Oil and Gas Conference TUROGE 2009 Ankara 11 March 2009 p 5 13 expected to help meet Turkey s rising energy needs Questions have been raised though with regard to how much gas Turkey will consume in the following years and whether Turkish policy makers may be exaggerating their future energy needs to strengthen their hand in negotiations on pipeline projects such as Nabucco According to BOTAS Turkey s natural gas demand is expected to increase to around 66 bcm by 2020 with almost 41 bcm expected to be consumed in 2009 But without additional import contracts Turkey will only be supplied with approximately 41 bcm by 2020 By 2015 with the expiring of contracts to import Algerian LNG and Russian natural gas by pipeline there is predicted to be a shortfall of around 15 bcm see Table 2 Turkey is currently heavily dependent on Russia for its gas imports This is likely to continue Talks have already commenced between BOTAS and Gazprom on renewing the contract which is due to expire by 2012 with early indicators suggesting that Russia could provide additional gas to the Turkish market after 2015 37 There has been a steady rise in natural gas and LNG imports to Turkey since deliveries commenced in 1987 see Table 3 37 Gazprom s delegation visits Turkey Gazprom Press Release 26 March 2009 http www gazprom com eng news 2009 03 35443 shtml 14 Table 2 Turkey Contracted Volumes and Natural Gas Demand mcm 2009 2010 2015 2020 Russian Fed west 6 000 6 000 0 0 Russian Fed 8 000 8 000 8 000 8 000 addition west Russian Fed 14 000 16 000 16 000 16 000 Black Sea Iran 9 556 9 556 9 556 9 556 Azerbaijan 6 600 6 600 6 600 6 600 Turkmenistan 0 0 0 0 LNG Algeria 4 444 4 444 0 0 LNG Nigeria 1 338 1 338 1 338 1 338 Total Contracted 49 938 51 938 41 494 41 494 Total Demand 40 903 43 806 56 183 65 867 This project is currently pending Source Figures adapted from BOTAS June 2009 Table 3 Turkey Natural Gas and LNG Imports mcm Natural Gas LNG Total 1987 433 433 1990 3 246 3 246 1995 5 560 1 298 6 858 2000 10 080 4 742 14 822 2001 11 046 5 322 16 368 2002 12 272 5 352 17 624 2003 16 195 4 993 21 188 2004 17 903 4 271 22 174 2005 22 147 4 881 27 028 2006 25 339 5 402 30 741 2007 30 583 5 867 36 450 2008 32 200 5 593 37 793 Source BOTAS June 2009 The accuracy of the projected BOTAS figures must be questioned Past estimates have been radically revised with earlier predicted demand needs lowered It appears that the current BOTAS estimates assume that the Turkish economy will grow by 8 9 percent year on average This assumption may be challenged At the time of writing the BOTAS figures still indicated that Turkey would consume around 41 bcm in 2009 in spite of the negative impact of the global economic crisis on the Turkish economy In its forecast announced in January 2009 EMRA predicted that Turkey would consume 35 bcm in 2009 38 about 3bcm less than it consumed in 2008 Unlike BOTAS EMRA does not make long term projections but works 38 Enerji Piyasasi Duzenleme Kurumundan Energy Market Regulatory Authority Kurul Karari Karar No Council Decision Decision no 19546 29 January 2009 http www epdk org tr mevzuat kurul dogalgaz 1954_6 1954_6 html 15 more with real time data On the other hand according to the Observatoire Mediterraneen de l Energie OME because of continued growth in the power generation sector Turkey will need to import over 90 bcm y by 2030 39 14 bcm more than the amount predicted by BOTAS for that year But there are other views which suggest much lower demand 40 The Turkish economy has undoubtedly suffered as a result of the global economic crisis In the last quarter of 2008 Turkey s gross domestic product GDP shrank by 6 2 percent 41 This was the first contraction in the economy since 2001 In mid April 2009 the government in Ankara announced that the economy would contract by 3 6 percent in 2009 and then grow by 3 3 percent and 4 5 percent in 2010 and 2011 The International Monetary Fund IMF has predicted that the Turkish economy will contract by 5 1 percent in 2009 and then will recover to grow by 1 5 percent in 2010 42 At the time of writing there were record levels of unemployment in Turkey there was a serious decline in industrial production and exports had plummeted Nevertheless the Turkish economy could quickly recover particularly if its traditional export markets in Europe begin to revive Possible agreement with the IMF over a large stand by loan could also boost investor confidence and kick start the Turkish economy But in the meantime given the economic problems it seems exceedingly unlikely that Turkey will need to consume over 40 bcm of gas in 2009 and it may actually consume considerably less In 2007 over 48 percent of electricity produced in Turkey was generated from gas 43 The power generation industry accounted for over 51 percent of gas consumption in 2006 followed by the residential and service sector which accounted for 35 percent By 2030 the power generation industry in Turkey is expected to account for 54 percent of gas consumption see Table 4 In the words of the OME the power sector will be the driving force in gas consumption in the future 44 Gas fired power stations are seen as reasonably environmentally friendly quick fit immediate solutions to address Turkey s energy needs By the end of 2008 426 applications had been made to EMRA to construct natural gas 39 Mediterranean Energy Perspectives 2008 Nanterre Observatoire Mediterraneen de l Energie 2008 p 335 40 Honore A European Gas Demand Supply and Pricing Cycles Seasons and the Impact of LNG Price Arbitrage Oxford University Press forthcoming 2009 41 Turkish economy hits brakes Q4 GDP shrinks 6 2 percent Turkey Daily News 31 March 2009 http www turkeydailynews com news 118 ARTICLE 1661 20090331 html 42 Turkey Economy to contract by 3 6 percent Stockhouse 13 April 2009 http www stockhouse com News FinancialNewsDetailFeeds aspx n 12410529 src cp IMF World Economic Outlook April 2009 Washington D C IMF 2009 p 194 43 Mediterranean Energy Perspectives 2008 p 361 44 Ibid p 335 16 fuelled power stations with an anticipated installation capacity of 26 555 Megawatts MW 45 Turkey s current installed capacity amounts to approximately 41 170 MW Table 4 Natural Gas Demand by Sector Turkey 2006 and 2030 2006 2030 Natural Gas Consumption 26 mtoe 83 mtoe Power Generation 51 54 Residential and Services 35 35 Industry 13 10 Other 1 1 Mtoe million tons of oil equivalent Source International Energy Agency BOTAS OME In spite of the interest of Turkish governments in making more use of lignite and hydropower launching a nuclear energy industry and exploiting renewable forms of energy Turkey has great potential in wind solar and geothermal energy gas will remain a key element in Turkey s future energy mix According to the OME the total final energy consumption in Turkey is expected to rise from 76 million tons of oil equivalent mtoe in 2006 to 188 mtoe in 2030 Renewables are expected to be used more extensively but their share of the total final energy consumption in 2030 is not predicted to amount to more than 5 percent On the other hand gas which accounted for 28 percent of total final energy consumption in 2006 is forecast to account for one third of total final energy consumption in 2030 46 It likely that Turkey s future gas demand requirements will continue to be largely met by imports of natural gas and LNG At present Turkey only produces around 900 mcm y of natural gas The OME suggests that domestic production will peak at around 1 bcm y in 2016 before eventually declining to 600 mcm y by 2030 More pessimistically the MENR predicts that Turkey s production of natural gas will decline to 252 mcm y by 2020 47 These figures may need revising because of the oil and gas exploration being conducted in the Black Sea by TPAO together with ExxonMobil and Petrobas Mehmet Uysal the General Manager of TPAO has publicly stated that the hydrocarbon reserves of the Black Sea may be comparable to those of the Caspian Sea with at least 1 5 trillion cubic metres tcm of gas waiting to be 45 Turkyilmaz Proposals for a new natural gas strategy for Turkey p 2 46 Mediterranean Energy Perspectives 2008 pp 322323 47 Ibid p 334 17 tapped 48 These figures appear to be highly optimistic Exploration in the Black Sea is not yet at an advanced stage It would seem that Turkey will still need to import substantial gas volumes in the future in order to meet economic growth Although the BOTAS projected figures may be exaggerated officials in Ankara are convinced that Turkey will need to import considerably greater amounts of gas in the future and are basing their energy policies on meeting Turkey s energy security needs 7 Turkey and Gas Supply Security Figure 1 Priority Pyramid for Turkish Gas Sector Source BOTAS According to BOTAS the priorities for the Turkish gas sector are depicted in the so called priority pyramid see Figure 1 Most emphasis is given to meeting Turkey s supply security needs The importance of this should not be over estimated when attempting to understand the positions of Turkish officials with regard to the prospects for a fourth gas corridor through Turkey Thus policy makers in Ankara will find it exceedingly difficult to agree to allow the passage of substantial gas volumes across Turkish territory without being 48 Black Sea oil to meet Turkey s needs for 40 years Today s Zaman 4 March 2009 http www todayszaman com tzweb detaylar do load detay link 168584 18 able to access a portion of these volumes for the Turkish market Access to this gas could also help Turkey to reduce its heavy dependence on Russian natural gas deliveries although officials in Ankara have tended to focus more on meeting gas security needs from whatever country of origin They have given less emphasis in practice to source and route diversification Hence officials in Ankara have argued that 15 percent of gas that is piped through Turkey should be allocated to the Turkish market and at concessionary prices as discussed later This percentage figure is based evidently on Turkey s rising gas needs in recent years 49 Article 2 9 of the IGA on the ITGI signed in Rome in July 2007 also refers to Turkey having the right to take 15 percent of gas transported across its territory 50 Interestingly the supplier of the gas Azerbaijan is not a party to this IGA The 15 percent offtake provision does not apply to the gas currently being transported to Greece from Azerbaijan via Turkey on the TGI In this case according to the December 2003 sales and purchase agreement between BOTAS and the Public Gas Corporation of Greece DEPA Turkey will buy up to 750 mcm y of gas from Azerbaijan and resell this same amount to Greece According to the sales and purchase agreement concluded between BOTAS and SOCAR in March 2001 Ankara has the right to re export gas delivered to Turkey from Azerbaijan in the first phase of production of gas from the Shah Deniz field It is also probable that Turkish policy makers in future negotiations would seek to obtain 15 percent of the gas that may piped through the TAP They have been pressing to secure this percentage in negotiations over the IGA for Nabucco It has been argued that the Turks are not acting against EU competition law as they are not discriminating against anyone 51 Turkey s insistence on a 15 percent offtake from a Nabucco pipeline has encountered opposition For example Mihaly Bayer Hungary s special envoy appointed to promote Nabucco reportedly stated that the demand for 15 percent of the gas was blocking negotiations on the IGA According to Bayer the Turkish claim would make the project financially infeasible 52 It has also been alleged that Ankara was seeking to profit by reselling the 15 percent of Nabucco gas it would receive at a higher price The European Commission s spokesman on energy issues Ferran Tarrandellas Espany openly declared that Turkey should not resort to this policy Some observers in Turkey have suggested that at one stage Turkish officials may have contemplated the idea of gas resales However in late 2008 BOTAS chief Duzyol categorically denied that Turkey intended to resell the gas Indeed 49 Interview with Emre Engur Ankara 14 April 2009 50 Interview with Levent Ozgul Strategy and Business Development Manager BOTAS Ankara 14 April 2009 51 Interview with Osman Z Goksel Ankara 15 April 2009 52 Turkey s gas request blocks Nabucco says Hungary Turkish Daily News 4 October 2008 http arama hurriyet com tr arsivnews aspx id 638252 19 Duzyol has stated that he would be happy to purchase all Azeri gas earmarked for the initial operation of Nabucco around 9 bcm y in order to satisfy Turkey s energy needs 53 Officials in Ankara have noted that in place of 15 percent of Nabucco gas they are willing instead to take 4 8 bcm y of Azeri gas produced in the second phase of production at Shah Deniz 54 According to the consortium members working at Shah Deniz the field is expected to produce an additional 16 bcm y in its second phase when fully operational If Turkey were to be successful in pressing its claim for 8 bcm y this would leave only a further 8 bcm y for possibly Nabucco the IGTI the TAP and Azerbaijan s own expanding energy needs In practice it would appear unlikely that Baku would be prepared to commit such large volumes to the Turkish market especially when bearing in mind that there has been a price dispute between the Azeri and Turkish authorities over gas produced in the first phase of Shah Deniz as outlined below Turkish policy makers have also stated that they would be prepared to drop the claim for 15 percent if the proposed Caspian Development Corporation CDC wins approval 55 The CDC is an initiative being developed by the European Commission which would entail the setting up of a consortium of European buyers to purchase gas produced in the Caspian and Gulf regions and the Middle East This initiative has full Turkish support 56 Through agglomerating demand the aim would be to promote investment and encourage the development of transportation routes westward to Europe In his Activity Report published in February 2009 Van Aartsen suggested that as a precondition for Turkey joining the CDC it should first establish a clear transmission regime based on cost and abandon its ad hoc approach 57 This idea has not gone down well with policy makers in Ankara There is no guarantee that the CDC will materialise The European Commission has instructed the World Bank to prepare a report on the CDC to be completed by the end of 2009 but certain energy companies have apparently only offered lukewarm support for the initiative It has been suggested that the announcement in December 2008 by RWE and OMV that they would form a Caspian Energy Company with the intention of transporting Turkmen gas to Europe could mark the first step toward the eventual realisation of the CDC 58 In April 2009 RWE secured a deal with the Turkmen authorities to develop an offshore field in the Caspian Sea This 53 O Byrne Turkey EC at loggerheads over Nabucco p 5 54 Interview with Osman Z Goksel Ankara 15 April 2009 55 Interview with Emre Engur Ankara 14 April 2009 56 Interview with Selim Kuneralp Deputy Undersecretary in the Turkish MFA Ankara 16 April 2009 57 Activity Report September 2007February 2009 European Coordinator Jozias van Aartsen Project of European Interest no NG3 Brussels 4 February 2009 pp 89 58 Interview with Emre Engur Ankara 14 April 2009 20 prompted Reinhard Mitschek the managing director of the Nabucco Consortium to remark that the deal was important for the development of the Nabucco project 59 Immediately after the holding of the Southern Corridor Summit in Prague in May 2009 the European Energy Commissioner Andris Piebalgs announced with regard to the negotiations on the IGA for Nabucco that the Turkish government had abandoned its demand for 15 percent of the gas transported across its territory Piebalgs declared that Ankara had instead agreed to cost based transit 60 But the next day energy minister Yildiz without making any reference to the issue of cost based transit asserted that the claims for 15 percent of gas were still on the table 61 8 Turkey and Access to Low Cost Gas The second and central part of the BOTAS priority pyramid with its reference to the need for importing low cost gas is also obviously of importance for Turkey s energy security Decision makers in Ankara are seeking to secure the 15 percent of gas transported across Turkish territory or 4 8 bcm y of Azeri gas produced in the second phase of Shah Deniz mentioned above at a favourable price Noting Turkey s geographical location they are opposed to paying the same price as Central Europeans for gas produced in the Caspian and Gulf regions and in the Middle East Turkish officials are insisting on purchasing the gas at Turkey s eastern border at a lower price 62 The issue is complicated by the fact that Turkey and Azerbaijan have been at loggerheads over the price paid by Ankara for gas deliveries from the first phase of production at Shah Deniz Turkey is set to receive 6 6 bcm of gas from Azerbaijan in 2009 having initially imported 1 2 bcm in 2007 after the SCP had become operational According to the terms of the sales and purchase agreement in the first year of deliveries the price would range in a band between 70 120 000 cubic metres This arrangement expired in April 2008 63 Speaking in Brussels in April 2009 President Aliyev asserted that it was not to the advantage of the consortium working at Shah Deniz that Turkey was only paying 120 000 cm when the 59 Nabucco chief Partner states to sign agreement in 2009 RFE RL News From Our Bureaus 6 May 2009 http www rferl org content Nabucco_Chief_Partner_States_To_Sign_Agreement_In_2009 1622556 html 60 Traynor Gas deal between Turkey and European Union breaks Russian stranglehold 61 AB Turkiye Nabucco da yuzde 15 ten vazgecti diyor Ankara kabul etmiyor 62 Interview with Emre Engur Ankara 14 April 2009 63 Perspectives on Caspian Oil and Gas Development International Energy Agency Working Paper series Directorate of Global Energy Dialogue 2008 1 December 2008 p 12 21 market price in 2008 had been between 400 500 000 cm 64 Before his appointment as energy minister Yildiz had been confident that the pricing issue would be resolved without the need to resort to arbitration 65 In late April 2009 the then energy minister Guler had claimed that 70 percent of the issues had been settled with regard to pricing 66 Without a swift resolution of this dispute it is difficult to imagine Baku agreeing to set aside for Turkey significant volumes of gas produced in the second phase of Shah Deniz where pricing would again need to be agreed upon To further complicate the picture tensions have escalated between traditional allies Turkey and Azerbaijan over the Armenia issue as previously noted In June 2008 Moscow had offered to procure Azeri gas from the second stage of Shah Deniz at European level prices implying a parity with the price paid on the European market for Russian natural gas minus the costs of transportation and export tax With further delays concerning Nabucco Baku may be tempted to accept Russia s offer This could be dependent on developments in Russian Azeri relations with perhaps Moscow pressing Yerevan to make concessions on the Nagorno Karabakh dispute Baku also has possible alternatives in transporting gas westwards to Europe along the ITGI and or the TAP At a briefing given in London in early April 2009 Peter Mellbye the head of international exploration and production at StatoilHydro which has a large stake in the Shah Deniz consortium noted that his company was interested in the possibilities of transporting Azeri northwards to Russia and also southwards to Iran 67 However there could be problems in delivering Azeri gas to the Russian market The current gas pipeline along the Caspian coast connecting Azerbaijan and Russia built in the Soviet era has a design capacity of 13 bcm y Its real operating capacity is likely to be much lower and technical work would be required to reverse the flow to enable gas to be transported northward 68 Taking these circumstances into account Turkey will probably eventually agree to pay more for the gas it currently receives from Azerbaijan In discussions held in Baku on 13 May 2009 with the head of SOCAR Abdullayev energy minister Yildiz offered to pay 200 000 cm for Azeri gas Abdullayev insisted that Turkey should pay 250 000 cm 69 Turkey has evidently 64 Aliyev Baku will align policy to region s new realities Today s Zaman 30 April 2009 http www todayszaman com tzweb detaylar do load detay link 173911 65 Interview with Taner Yildiz Ankara 15 April 2009 66 S Aliyev Azerbaijan Turkey have principle agreements on gas price minister Baku 29 April 2009 http newsen trend az politics foreign 1462945 html 67 Ben Farey Norway s Statoil may bypass Turkey imperilling Nabucco pipeline Bloomberg 2 April 2009 http www bloomberg com apps news pid 20601087 sid aGW4J2FWmlBM refer home 68 Perspectives on Caspian Oil and Gas Development pp 4142 69 Bargaining for Azeri gas Hurriyet Daily News 16 May 2009 http www hurriyet com tr english domestic 11660208 asp gid 243 22 been paying between 400 and 450 000 cm for imports of Russian gas There would appear to be room for a deal but this price haggling may yet work to Turkey s disadvantage If Baku were to accept Moscow s offer to purchase future Azeri gas production or if the Kremlin would agree to the transit of Azeri gas across Russian territory to Europe the prospects for Turkey becoming a fourth corridor for the delivery of gas to Europe would be seriously diminished 9 Turkey and Transit Opportunities The concerns involving the offtake and pricing of gas are closely linked to the question of what sort of gas transit regime should be agreed upon between Ankara and Brussels in the negotiations on the IGA for Nabucco The top of the BOTAS priority pyramid may not be separated from its other parts With regard to Nabucco Turkish officials have complained that EU bureaucrats have been unnecessarily dragging out discussions on the issue of transit In Brussels in March 2009 the then energy minister Guler voiced his frustration that the Europeans had still to respond to a draft text of the IGA which the Turkish government had submitted in February 2008 70 In April 2009 Guler forwarded a letter to the European Commission urging Brussels to expedite the talks 71 Difficulties in resolving the transit issue must be understood in the wider context of the Turkish accession process to the EU There is a general sense in Ankara that the Europeans are demanding various concessions from the Turks without offering anything in return blocking the opening of the energy chapter for example On the other hand there appears to be a feeling among officials in Europe and among some energy companies that if Turkey wants to be a full member of the EU it should immediately sign up to European norms and regulations Misunderstandings and breakdowns in communication appear to further cloud the picture Nevertheless it was clear that StatoilHydro was pointing the blame at Turkey when in April 2009 at the sidelines of the energy conference in Sofia the company s head of operations in Azerbaijan announced that production from the second phase of Shah Deniz had been postponed until 2016 because of problems in setting transit conditions 72 A whole range of development problems has also caused delays at Shah Deniz Commentators have accused Turkey of insisting on exorbitant transit fees for the transportation of gas for the Nabucco project It has been argued that this would cut future 70 O Byrne Turkey EC at loggerheads over Nabucco p 4 71 Nukleer enerjide komisyon calismalarini bitirdi The Commission has finished its studies on nuclear energy Dunya Istanbul 4 April 2009 http www dunyagazetesi com tr haber asp id 43084 cDate 72 Update 1 AzeriShakhDeniz II gas seen around 2016 Statoil Reuters Sofia 24 April 2009 http in reuters com article oilRpt idINL019126720090424 23 profit margins raise unnecessary questions about investment returns and delay the funding of the project 73 Van Aartsen has complained about Turkey having adopted a position on taxing on an ad hoc and unpredictable basis although he noted a recent evolution of Turkey s position However the EU s Coordinator for the Southern Corridor has insisted that Turkey should agree to free transit for trade in line with Article 5 of the General Agreement on Tariffs and Trade GATT the predecessor of the World Trade Organisation WTO He advocated the need for a joint Azerbaijan Georgia Turkey Gas Corridor Transmission Agreement with the EU based on Article 5 of GATT and on cost based transmission principles reinforced with a mutual assistance obligation 74 Officials at BOTAS have emphasised that they have never demanded a transit fee for gas to be transported along a Nabucco pipeline One could perhaps question what is exactly meant by this use of transit fee With regard to Nabucco specifically the term transit fee appears to have become a pejorative one BOTAS claims that they have been asking for the standard terms Operational expenditure Opex Capital expenditure Capex a rational or reasonable profit margin 75 These conditions would be in line with the terms of the Energy Charter Treaty ECT of which Turkey is a full member The ECT refers to the freedom of transit non discrimination and transparency with regard to trade in hydrocarbons although there have been attempts to reinforce further its provisions through the draft transit protocol which has yet to be approved The ECT notably also has a dispute settlement mechanism for resolving trade issues It would appear then that through its membership of the ECT Turkey is ready to agree to market terms for the transit of gas through its territory The signed IGA for the ITGI may be taken as a model at least in part for the IGA for the Nabucco pipeline According to DEPA s General Director of Corporate Development and Planning the transportation tariffs for the various sections of the ITGI in Turkey Greece and for the Poseidon Pipeline across the Adriatic Sea would be based on cost reflective principles using reasonable returns for incurred investments 76 The earlier agreed and ratified IGA for the TGI has incorporated an ECT dispute settlement mechanism and it seems that this is also the case for the ITGI In the EU s Screening Report on Turkey and the energy chapter of the acquis published in March 2007 before the signing of the IGA for the ITGI it was stated that Turkey had incorporated the ECT s dispute settlement mechanism into the 73 Vladimir Socor Turkey s stalling on Nabucco hurts Europe Azerbaijan and itself Part one Eurasia Daily Monitor Vol 6 no 42 4 March 2009 http www jamestown org programs edm single tx_ttnews 5Btt_news 5D 34657 tx_ttnews 5BbackPi d 5D 407 no_cache 1 74 Activity Report September 2007February 2009 pp 6 and 9 75 Interview with Emre Engur Ankara 14 April 2009 76 Vasileios Tsompanopoulos ITGI Project Presentation given to the World Energy Council regional meeting Istanbul 17 October 2008 http cesenet org documents 8_vasileios_tsompanopoulos ppt 24 relevant intergovernmental agreements although it added Turkey should adopt and implement an appropriate legal framework to facilitate the transit of energy materials and products 77 Some Turkish officials have indicated that the European Commission may yet take the parties to the IGA on the ITGI to court on the grounds that the contract may not fully conform to EU legislation A blind eye appears to have been turned to the previous IGA for the TGI perhaps because of the relatively small volumes of gas involved As indicated below legal problems do appear to have contributed to the delay in concluding the IGA for Nabucco There are signs that Turkey is moving towards formalising a gas transit regime A Law on Transit of Petroleum through Pipeline was published in June 2000 This ostensibly covers the rules and procedures for the transit of both petroleum and natural gas In June 2001 a Transit Petroleum Board was established to determine and set legal technical administrative financial and other services for transit for petroleum and natural gas projects 78 However there does appear to be an acknowledgement by officials in Turkey that a new gas transit regime should be prepared for gas separate from the agreed legislation and procedures which in practice have been solely applied to the transit of crude oil At the time of writing effectively no molecule of gas had transited Turkey Volumes being delivered on the TGI consisted of resold gas and also probably gas which had physically originated from Russia and entered the Turkish market The MENR has apparently recently formed a new transit pipeline body which will consider gas transit issues 79 And BOTAS officials have intimated that a new gas transit regime will probably be established when the Natural Gas Market Law of 2001 is likely to be amended later in 2009 80 These developments are most likely being taken into account in negotiations on the IGA for Nabucco It seems that in the negotiations on the IGA for Nabucco one of the major difficulties has been how to reconcile the applicability of two sets of legislation EU law and Turkish law with regard to the operation of a pipeline on Turkish territory This has become a sensitive issue of national sovereignty for some in Ankara There have been concerns that Turkish law should not be regarded as somehow inferior to EU law One would assume however that Turkey s membership of the ECT which is after all based on the provisions of Article 5 of the GATT would somehow help to bridge this problem And if the energy chapter had been opened as previously noted legal complications could have been swiftly addressed 77 Screening Report Turkey Chapter 15 Energy 22 March 2007 pp 6 and 11 http www abgs gov tr files tarama tarama_files 15 screening_report_15_tr_internet_en pdf 78 Screening chapter 15 Energy Agenda item International agreements General international agreements in the domain of energy energy chapter Country session The Republic of Turkey 1415 June 2006 http www abgs gov tr tarama tarama_files 15 SC15DET_Energy 20Charter 20Treaty pdf 79 Interview with Necdet Pamir Ankara 13 April 2009 80 Interview with Emre Engur Ankara 14 April 2009 25 In spite of these various problems progress does seem to have been made in recent months in negotiations on the IGA for Nabucco and this appears in part to have been due to better coordination on the Turkish side with the MFA apparently assuming greater responsibility The wording of the Prague Declaration at the conclusion of the summit on the southern corridor in May 2009 may suggest that the legal hurdles were about to be overcome The signatories to the Declaration which included President Gul promised to work toward an energy transit treaty with rules on how energy supplies should be transported how much transit countries should charge and how fees should be shared Significantly the Declaration also boldly stated that member states and Turkey had agreed to reach a deal to sign an IGA for Nabucco by the end of June 2009 81 On the other hand the Declaration was only a declaration and was not a binding agreement 10 Turkey and Trade Opportunities In the negotiations for the IGA on Nabucco another complicating factor has been the various references made by officials in Ankara to Turkey becoming a future energy hub In some instances they may have been referring to Turkey becoming a trading hub as opposed to being merely a physical hub A trading hub would presumably involve the reselling of gas and this may have led observers to claim that Ankara was demanding the right to receive and possibly resell 15 percent of gas being transported through Turkish territory However officials at BOTAS have indicated that the notion of Turkey becoming a trading hub for natural gas was one which could only be realised in the longer term and would not apply in the case of Nabucco 82 Presumably these officials would not have been happy with the suggestions of Van Aartsen in his Activity Report on natural gas hubs Instead of Turkey becoming a single hub the EU s coordinator proposed somewhat unrealistically that four alternative natural gas hubs should be developed for the southern or fourth corridor in Azerbaijan Romania Greece and Austria 83 The authorities in Ankara are not exclusively focusing their attention on the Nabucco pipeline given the trading opportunities that could arise from progress being made on other natural gas projects Turkish officials have noted somewhat optimistically perhaps that even without Nabucco the realisation of the IGTI and or the TAP could still make Turkey a part of a fourth gas corridor Gas volumes from these pipelines could also help meet Turkey s rising energy needs If both the ITGI and the TAP were realised simultaneously and Turkey succeeded in obtaining 15 percent of the gas transported along these pipelines an additional 5 bcm y could enter the Turkish market But these two projects are both competing for Azeri 81 The Declaration Prague Summit Southern Corridor May 8 2009 82 Interview with Levent Ozgul Ankara 15 April 2009 83 Activity Report September 2007February 2009 pp 910 26 gas although the TAP could also deliver Iranian gas bearing in mind the deal concluded between EGL and NIGEC New LNG contracts could be negotiated including with Qatar for instance And future gas import deals with SOCAR Gazprom and Iran and possibly with companies in Iraq for example after the revision of the Natural Gas Market Law of 2001 could include re export clauses to allow Turkey to become a gas trading hub In order to achieve such objectives the gas pipeline grid in Turkey would need to be upgraded Apparently the grid in its current state only has a spare capacity of around 6 bcm y If Nabucco the ITGI and the TAP projects would all be realised up to 6 billion would have to be invested in the Turkish pipeline network to handle the increased volumes 84 There may be scope for incremental additions to the grid to accommodate the amounts envisaged for the ITGI but evidently any project involving the transportation of over 8 bcm y would require a stand alone pipeline to be constructed across Turkey 11 Conclusion At the time of writing the situation remained very fluid and uncertain concerning the possible signing of the IGA on Nabucco after the statements made at the Prague Summit on the Southern Corridor and the non binding Declaration agreed and signed at the summit itself It has been earlier noted that energy minister Yildiz contradicted the remarks of energy commissioner Piebalgs who had claimed that the IGA would be signed in Ankara on 25 June 2009 President Gul himself who had added his signature to the Declaration was then quoted at the time as saying that the opening of the energy chapter was related to the credibility of the EU 85 This may suggest that without the Greek Cypriots signalling that they would be prepared to lift their veto on the opening of the energy chapter Turkey could delay the signing of the IGA This monograph has underlined the close links between the problems and prospects for Turkey s EU accession and the difficulties encountered in the negotiations to realise Nabucco Even if Ankara does sign the IGA the Nabucco project would not automatically proceed given the problems in securing funding and acquiring enough gas to fill the proposed pipeline The future of other pipeline projects including the ITGI and the TAP as well as White Stream also remains open to question especially with regard to financing and throughput capacity The ITGI is most likely to be developed given the signing of the IGA for this project and the operation of the TGI The TAP may also get the go ahead given StatoilHydro s involvement Both the ITGI and the TAP could materialise before Nabucco with the White Stream project the least likely to evolve Moscow is continuing to progress 84 Interview with Gokhan Yardim Manager of ADG Anadolu Natural Gas Consultancy Trade Limited Ankara 15 April 2009 85 President Gul on normalisation of TurkeyArmenia relations Anadolu News Agency Prague 8 May 2009 27 South Stream with additional agreements concluded at Sochi on 15 May 2009 between Gazprom and ENI and with the companies of states in south eastern Europe interested in the project But further progress will be dependent on securing transit through the Ukrainian or Turkish EEZs in the Black Sea There is much speculation among observers in Turkey that some form of Grand Bargain could perhaps be struck with Russia over energy Supposedly Ankara would allow Gazprom to construct the subsea section of South Stream across Turkey s EEZ and in return Moscow could allow the flow of Kazakh and possibly Russian crude along the planned Samsun Ceyhan oil pipeline The package could also include a deal to construct the so called Blue Stream 2 gas pipeline connecting Russia and Turkey This could provide Turkey with new trading opportunities if re export clauses would be included in an agreement At the time of writing though much still needed to be realised before this Grand Bargain could materialise And this arrangement would not reduce Turkey s energy dependence on Russia Geography may be to Turkey s advantage concerning the prospects for a fourth corridor although security problems especially with regard to the PKK could yet cause further complications A number of other issues remained unresolved at the time of writing such as the disagreements between Turkey and Azerbaijan over gas pricing the routing of gas to be produced in the second phase of Shah Deniz and the question as to whether the CDC would be established However it does appear with regard to Nabucco at least that policy makers in Ankara have been able to better coordinate their positions in recent months and the conclusions reached at the Prague Summit in May 2009 would suggest that the Europeans are also beginning to speak more with one voice on energy matters 28 APPENDIX 1 Proposed Pipelines for the Fourth Natural Gas Corridor and South Stream Nabucco This planned 3 300 km pipeline project will run from Turkey s borders with Georgia and Iran to Baumgarten in Austria along a route passing through Bulgaria Romania and Hungary The current estimated cost of construction is 7 9 billion although this could climb to 12 billion A consortium the Nabucco Gas Pipeline International GmbH was established in June 2004 to develop construct and operate the pipeline and market the gas transported through it The consortium will conclude transportation contracts with shippers on the one stop shop principle There are at present six shareholders in the consortium namely BOTAS MOL PLC of Hungary OMV Gas Power GmbH of Austria the Bulgarian Energy Holding EAD Transgaz SA of Romania and the German company RWE AG which joined the consortium later in February 2008 Identified as a priority project by Brussels engineering work commenced in April 2009 supported by 200 million offered by the EU as part of its general economic stimulus package It is not clear where the gas will come from to fill the pipeline with its projected final operational capacity of 31 bcm y although Azerbaijan Turkmenistan Iran and Iraq for example have been identified as possible suppliers For further details see http www nabucco pipeline com project Interconnector Turkey Greece Italy ITGI The Turkey Greece Interconnector TGI was officially inaugurated on 17 November 2007 This 296 km link connected Karacabey in Turkey with Komitini in Greece and included a 17 km stretch under the Sea of Marmara The TGI has a capacity of around 12 bcm y This pipeline is planned to be extended to Italy The new section in Greece running from Komitini to Thesprotia is estimated to cost 600 million The 215 km connection from Thesprotia to Otranto in Italy involving the laying of a pipeline across the Adriatic Sea is estimated to amount to approximately 300 500 million DEPA and Edison have established a 50 50 joint venture Poseidon SA to construct the subsea Poseidon Pipeline The pipeline connecting Greece and Italy will have a capacity of about 8 5 bcm y The Greeks and Italians have included tentative agreements with Azerbaijan for the possible delivery of gas There are plans to reach a final investment decision for the ITGI by early 2010 with the aim to begin construction in the autumn of 2010 The main markets for gas transported along the ITGI are likely to be Edison s power plants in Italy as well as power stations in Greece For further details see Vasileios Tsompanopoulos ITGI Project Presentation given to the World Energy Council regional meeting Istanbul 17 October 2008 http cesenet org documents 8_vasileios_tsompanopoulos ppt 29 The Trans Adriatic Pipeline TAP This planned 520 km pipeline would connect Thessalonika in Greece with Puglia in southern Italy along a route crossing Albania and the Adriatic Sea According to initial estimates the costs will come to about 1 5 billion A feasibility study was completed in 2006 and extended basic engineering work was concluded in March 2007 In 2008 more detailed engineering studies commenced EGL and StatoilHydro established in February 2008 a 50 50 joint venture the Trans Adriatic Pipeline Company In June 2008 the company filed an application with the Greek authorities to build the 200 km stretch from Thessalonika to the Greek Albanian border The project also includes plans to build up gas storage capacity in Albania An investment decision is hoped to be reached before the end of 2009 The pipeline would probably be filled with Iranian gas EGL s contract with NIGEC and gas from Azerbaijan given StatoilHydro s stake in the Shah Deniz consortium Gas would be delivered to EGL s power plants in Italy and possibly Switzerland The projected final operational capacity of the pipeline is 20 bcm y For further details see http www trans adriatic pipeline com White Stream Currently three routes are being considered for this project originally known as the Georgia Ukraine EU gas pipeline GUEU which would connect Georgia with either Ukraine and or Romania by pipelines running across the Black Sea The White Stream consortium an independent organisation which includes energy service companies has been founded to develop the project On 3 April 2009 the Georgian government signed a memorandum of mutual understanding with this consortium The current government in Ukraine is also very supportive of the project In December 2008 the European Commission agreed to fund a feasibility study Still at an early stage of development the costs of the project are not yet known It is not clear who would invest in the project There is no information with regard to the sources of gas or the intended markets although the projected final operational capacity of White Stream is 32 bcm y For further details see http gueu whitestream com index php id 6 lang eng 30 South Stream In 2007 Gazprom and the Italian firm ENI agreed to establish a company on an equal basis to develop the South Stream project This is planned to entail the construction of a 900 km pipeline to link Beregovaya on the Russian Black Sea coast with Bulgaria From Bulgaria two routes are being considered to transport gas to Italy and Austria One branch could run through Greece and across the Adriatic to Italy A northern link would connect with Romania Hungary and Serbia A spur to Slovenia is also being planned A final decision with regard to routing is expected by the end of 2009 Intergovernmental agreements have already been concluded with Bulgaria Greece Hungary and Serbia The costs of the project are currently estimated at between 19 24 billion On 15 May 2009 Gazprom and ENI agreed to more than double the anticipated capacity of South Stream from 31 bcm y to 63 bcm y It is intended to begin construction in 2011 and commence operations in 2015 For further details see http www gazprom com eng articles article27150 shtml 31| Energy | The Caspian and Central Asia |
|